1981 GE Frame 6B gas turbine
1981 GE Frame 6B gas turbine
Contact us for price
Available quantity: 2
Düsseldorf, Germany
Description
2x GE Frame 6B gas turbines
Commissioned in 1981
- Operated as a CCGT plant (fuel: gas) until 2005 (base load - approx. 7000 h/year)
- Operating hours in the CCGT process: GT21 = approx. 167,000 h (approx. 1130 starts) GT22 = approx. 159,000 h (approx. 1180 starts)
- 1996 Retrofitting of water injection for NOx reduction - 2007 Conversion to peak load plant (fuel: HEL) with new steel stacks and conversion of the measurement technology and control system from Mark II to ABB Procontrol 14
- Operating hours in peak load mode: GT21 = approx. 130 h (approx. 177 starts) GT22 = approx. 150 h (approx. 180 starts)
- Last grid operation in 2015
- Last oil service (Mobil DTE Light): GT21 = 10/2015 / GT22 = 09/2016
- Last endoscopy in 12/2016.
The spare parts are:
- compressor and turbine blading, used (various) and revised (leading row 2 + 3 and running row 1 + 2)
- Transition pieces used and revised
- Flammrohre used and revised
- Fuel nozzles and much more.
- Cover segments (new)
- As well as a complete warehouse with small parts (hydraulic components, screw connections, seals, measurement technology, etc.)
The spare parts are:
Compressor and turbine blading,
used (various) and overhauled (guide row 2 + 3 and running row 1 + 2)
Transfer pieces
used and overhauled
Flame tubes
used and overhauled
Fuel nozzles and much more.
Cover segments (new)
As well as a complete warehouse with small parts (hydraulic components, screw connections, seals, measurement technology, etc.)
Find more here - https://www.ucymachines.com/
Contact us at - sales@ucymachines.com
Specifications
Manufacturer | GE |
Model | Frame 6B gas turbine |
Year | 1981 |
Condition | Used |