1981 GE Frame 6B gas turbine

1981 GE Frame 6B gas turbine

Contact us for price

Available quantity: 2

Düsseldorf, Germany

Description

2x GE Frame 6B gas turbines


Commissioned in 1981

- Operated as a CCGT plant (fuel: gas) until 2005 (base load - approx. 7000 h/year)

- Operating hours in the CCGT process: GT21 = approx. 167,000 h (approx. 1130 starts) GT22 = approx. 159,000 h (approx. 1180 starts)

- 1996 Retrofitting of water injection for NOx reduction - 2007 Conversion to peak load plant (fuel: HEL) with new steel stacks and conversion of the measurement technology and control system from Mark II to ABB Procontrol 14

- Operating hours in peak load mode: GT21 = approx. 130 h (approx. 177 starts) GT22 = approx. 150 h (approx. 180 starts)

- Last grid operation in 2015

- Last oil service (Mobil DTE Light): GT21 = 10/2015 / GT22 = 09/2016

- Last endoscopy in 12/2016.


The spare parts are:

  • compressor and turbine blading, used (various) and revised (leading row 2 + 3 and running row 1 + 2)
  • Transition pieces used and revised
  • Flammrohre used and revised
  • Fuel nozzles and much more.
  • Cover segments (new)
  • As well as a complete warehouse with small parts (hydraulic components, screw connections, seals, measurement technology, etc.)



The spare parts are:


Compressor and turbine blading,

used (various) and overhauled (guide row 2 + 3 and running row 1 + 2)


Transfer pieces

used and overhauled


Flame tubes

used and overhauled


Fuel nozzles and much more.

Cover segments (new)

As well as a complete warehouse with small parts (hydraulic components, screw connections, seals, measurement technology, etc.)






Find more here - https://www.ucymachines.com/


Contact us at - sales@ucymachines.com

Specifications

ManufacturerGE
ModelFrame 6B gas turbine
Year1981
ConditionUsed